Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 10 results ...

Abdul-Aziz, A (2001) Unraveling of BOT Scheme: Malaysia's Indah Water Konsortium. Journal of Construction Engineering and Management, 127(06), 457–60.

AbouRizk, S, Knowles, P and Hermann, U R (2001) Estimating Labor Production Rates for Industrial Construction Activities. Journal of Construction Engineering and Management, 127(06), 502–11.

Allouche, E N, Ariaratnam, S T and AbouRizk, S M (2001) Applications of Horizontal Characterization Techniques in Trenchless Construction. Journal of Construction Engineering and Management, 127(06), 476–84.

Gerber, J K and Yacoubian, G S (2001) Evaluation of Drug Testing in the Workplace: Study of the Construction Industry. Journal of Construction Engineering and Management, 127(06), 438–44.

Hegazy, T and Ersahin, T (2001) Simplified Spreadsheet Solutions. I: Subcontractor Information System. Journal of Construction Engineering and Management, 127(06), 461–8.

Hegazy, T and Ersahin, T (2001) Simplified Spreadsheet Solutions. II: Overall Schedule Optimization. Journal of Construction Engineering and Management, 127(06), 469–75.

Isidore, L J and Back, W E (2001) Probabilistic Optimal-Cost Scheduling. Journal of Construction Engineering and Management, 127(06), 431–7.

Lowe, D J and Skitmore, R M (2001) Human Effects in Construction Contract Price Forecasting: Experience and Experiential Learning Styles. Journal of Construction Engineering and Management, 127(06), 485–93.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2001)127:6(485)
  • Abstract:
    This paper reports on a fully structured interview survey, using a multisectional questionnaire, of experienced construction contract price forecasters. The aim of the research was to investigate the relationship between the accuracy of “early-stage” forecasts and experience (defined in terms of the forecasters' length of service as a forecaster and the number of forecasts prepared), learning styles, and approaches to learning. The results show that, although the forecasters rated experience very highly, the relationships between their ability to learn from experience, measured in terms of individual learning styles and approaches to learning, and the quality of their forecasts were found to be very different from those anticipated. No significant correlations were found between forecasting accuracy and the experience measures used, except for the approaches-to-learning dimensions labeled Risk taking, Insecurity, and Self-confidence. The results for the Insecurity and Self-confidence dimensions suggest that balanced forecasters (i.e., those who were neither insecure nor overconfident) produce more consistent forecasts. Similarly, the results for the Risk-taking dimension indicate that high-risk takers tend to underestimate whereas those who are more conservative tend to overestimate contract prices.

Pena-Mora, F and Park, M (2001) Dynamic Planning for Fast-Tracking Building Construction Projects. Journal of Construction Engineering and Management, 127(06), 445–56.

Pheng, L S and Chuan, C J (2001) Just-in-Time Management of Precast Concrete Components. Journal of Construction Engineering and Management, 127(06), 494–501.